National Solar Mission राष्ट्रीय सौर मिशन

🔆National Solar Mission:
 
✅ To promote development & use of solar energy for power generation & other uses. 
✅Inaugurated in 2010 with a target of 20GW by 2022. Later increased to 100 GW in 2015. 
✅ MNRE has proposed to achieve 60 GW from large and medium scale solar projects, and 40 GW through rooftop solar projects. 
😅Committed to Nationally Determined Contributions (Paris Accord), India made a pledge that by 2030, 40%  
of installed power generation capacity shall be based on clean sources. 
✅ It was determined that 175 GW of renewable energy capacity will be installed by 2022. 
✅This includes 100 GW from solar, 60 GW from wind, 10 GW from bio-power and 5 GW from small hydro  power. 
✅India is at 5th global position for overall installed renewable energy capacity.

🔆 राष्ट्रीय सौर मिशन:
 
 बिजली उत्पादन और अन्य उपयोगों के लिए सौर ऊर्जा के विकास और उपयोग को बढ़ावा देना।
 2022 तक 20GW के लक्ष्य के साथ 2010 में Inaugurated। बाद में 2015 में बढ़कर 100 GW हो गया।
  एमएनआरई ने बड़ी और मध्यम स्तर की सौर परियोजनाओं से 60 गीगावॉट, और रूफटॉप सौर परियोजनाओं के माध्यम से 40 गीगावॉट प्राप्त करने का प्रस्ताव किया है।
  राष्ट्रीय स्तर पर निर्धारित योगदानों (पेरिस समझौते) के लिए भारत ने 2030 तक 40% का संकल्प लिया
 स्थापित विद्युत उत्पादन क्षमता स्वच्छ स्रोतों पर आधारित होगी।
 यह निर्धारित किया गया था कि 2022 तक 175 गीगावॉट अक्षय ऊर्जा क्षमता स्थापित की जाएगी।
 इसमें सौर से 100 गीगावॉट, हवा से 60 गीगावॉट, पवन ऊर्जा से 10 गीगावॉट और छोटी पनबिजली से 5 गीगावॉट शामिल हैं।
 ✅भारत समग्र रूप से स्थापित अक्षय ऊर्जा क्षमता के लिए 5 वें वैश्विक स्थान पर है।